Well, we've been working on Heloise since Saturday.:lol: So far we've replaced the shackles, put a 4 inch lift and new wheels and tires (35's), wired all new engine and dash electrics, and put the YJ tub on (though it's not bolted to the frame yet) with a 1 inch lift. I'll put up pictures...