thats a big list, and not every 4 link is the same.
you will need material for upper links, probably 1.5-.25 DOM
lower links and I would sleeve them or they will bend like a pretzel, 1.75-.120 ober 1.5-.25 DOM
you will need 4 joints of your likeing, I prefer Johnny Joints. you will need a rear truss, axle link mounts, lower link frame mount, upper frame mount, springs of some type, I assume your on a budget so coil springs, axle end coil buckets, frame coil mounts, new soft brake lines to transition from the frame to the link, then the link to the axle, probably need limit straps. You will have to address your gas tank if you stretching, also might have to rebuild the rear frame if you stretch it or you will be stupid high.
I have built plenty of these set ups, my best advise, build it at full compression, that way you know everything will fit.